Registered Power Zones report for the UK Government


This report was produced as part of a Department of Trade and Industry (DTI) funded research project. Its objectives were as follows.

  • Research the technical, regulatory and commercial possibilities associated with the concept of Registered Power Zones
  • Conduct feasibility studies on two potential RPZ sites in the CE Electric network region (northeast England)
  • From the results of the feasibility studies, draw out generic designs, rules and techniques that could be useful in any RPZ, and disseminate the results from this research project

Download: Assessing feasibility of RPZ on CE Electric network areas


Deprecated: Theme without comments.php is deprecated since version 3.0.0 with no alternative available. Please include a comments.php template in your theme. in /var/www/html/decerna.co.uk/public_html/wp-includes/functions.php on line 5523

Comments are closed.